Artificial intelligence can help draft a SWMS
AI-generated SWMS should never be considered a finalised document.
Artificial intelligence (AI) tools are increasingly being used in both personal and workplace settings, including to assist in the preparation of safe work method statements (SWMS) for high-risk construction work (HRCW).
When used appropriately, AI can be a useful starting point for developing a SWMS, assisting with drafting and formatting. It can identify common hazards, risks and control measures, and may highlight issues that could otherwise be overlooked. However, AI-generated SWMS should never be considered a finalised document.
AI takes a broad approach and cannot adequately account for site-specific hazards. As such, it should only be used as a draft to support the development of SWMS.
A Safe Work Method Statement is a document that:
- identifies work that is high-risk construction work; and
- states the hazards and risks of that work; and
- sufficiently describes measures to control those risks; and
- describes how the risk control measures are to be implemented; and
- is set out and expressed in a way that is readily accessible and comprehensible to the persons who use it.
AI does not replace consultation with employees. Developing a SWMS needs to involve genuine consultation with the workers undertaking the task and, where applicable, their health and safety representatives.
Steps for preparing a SWMS:
-
- Bring together the relevant employees, their HSRs and supervisors at the location of the proposed HRCW, if possible
- Review the proposed works and consider any site-specific factors that could impact the works
- Ensure all proposed HRCW activities are identified, and hazards and risks are listed
- Select the risk control measures and describe them alongside each of the hazards and risks that are listed
- Assess, review and, if necessary, update the SWMS. Hand-written amendments can be made on site.
Anyone performing the HRCW must ensure any AI-generated SWMS complies with regulation 324 of the Occupational Health and Safety Regulations 2017. It must clearly identify the work, associated hazards and risks, appropriate control measures, how those controls will be implemented, and present the information in a clear and accessible format.
AI can assist in preparing a SWMS, but it cannot replace site-specific planning, consultation, or review.
For more information on how to prepare a SWMS for high-risk construction work visit: https://www.worksafe.vic.gov.au/resources/safe-work-method-statements-guidance
Bowens Benefits
A loyalty account that gets you 5% off every shop
Ready to sign up?
Already have an account?
Login hereTrade Account
Custom pricing, 30-day trade credit + more
Ready to apply?
Already have an account?
Login here
